The Principal Reason Why BP Got Off

The Principal Reason Why BP Got Off

Tampa, FL (March 25, 2015) – An article titled, “10 Reasons Why BP Got Off and Offshore Oil Drilling Just Got More Dangerous,” was recently published by Rolling Stone magazine. The author of the article, Antonia Juhasz, correctly points out, “Recent judgments in the civil trial against BP, which has entered its third and final phase in a New Orleans court, will not only result in a significantly reduced fine for BP, but may also mean that no meaningful regulatory changes are implemented to reduce the likelihood of another similar disaster.”

The article focuses on misguided court rulings which suggest that critical safety improvements for offshore drilling are now far less likely to occur. However, the principal reason why BP “got off” goes far deeper than the Clean Water Act decisions.

The principal reason why BP got off is the collusive nature of the BP oil spill litigation. The PSC, the collusive BP/PSC settlement, questionable MDL 2179 rulings, and Kenneth R. Feinberg’s “Fund Approach” and illegal “Release and Covenant Not to Sue” have all contributed to ensuring the limitation of BP’s liability at the expense of the BP oil spill victims.

In essence, BP won the MDL 2179 case on February 9, 2011 when the PSC designated the B1 Master Complaint as an admiralty or maritime case, and requested a non-jury trial pursuant to Rule 9(h), rather than properly allege claims under the Oil Pollution Act of 1990 (OPA), a strict liability statute, and the Outer Continental Shelf Lands Act (OCSLA€).

Again, OPA is a strict liability statute. In order to recover damages, a claimant merely needs to show that his or her damages “resulted from” the oil spill.

OPA, in pertinent part, states: “The responsible party for a vessel or a facility from which oil is discharged, or which poses the substantial threat of a discharge of oil, into or upon the navigable waters or adjoining shorelines or the exclusive economic zone is liable for the removal costs and damages that result from such incident.” See 33 U.S.C. § 2702(a).

The damages referred to in 33 U.S.C. § 2702(a) include, but are not limited to: “Damages equal to the loss of profits or impairment of earning capacity due to the injury, destruction, or loss of real property, personal property, or natural resources, which shall be recoverable by any claimant.” 33 U.S.C. § 2702(b)(2)(E) (Emphasis added).

OPA further provides, (a) “Payment or settlement of a claim for interim, short-term damages representing less than the full amount of damages to which the claimant ultimately may be entitled shall not preclude recovery by the claimant for damages not reflected in the paid or settled partial claim.” 33 U.S.C. § 2705(a) (Emphasis added); and (b) “Payment of such a claim [i.e. payment to a claimant for interim, short-term damages representing less than the full amount of damages to which the claimant ultimately may be entitled] shall not foreclose a claimant’s right to recovery of all damages to which the claimant otherwise is entitled under this Act or under any other law.’’ 33 U.S.C. §§ 2715(b)(1) and (2) (Emphasis added).

Congress never intended that a claimant’s recovery of damages under OPA be limited by geographic bounds, pertain solely to certain business activities, or require a heightened, and in this case vague, proof of causation between his or her damages and the oil spill incident. Moreover, OPA expressly prohibits Responsible Parties from engaging in a “Delay, Deny, Defend” strategy wherein the victims of an oil spill are starved and ultimately forced to sign a “Release and Covenant Not to Sue” in order to receive an inadequate, miniscule payment amount for the damages they incurred as a result of the oil spill.

It is important to note that Ken Feinberg was BP’s defense attorney. He was not merely a “Fund Administrator.” Feinberg was retained by BP to limit BP’s liability.

We are the only law firm to file suit against Kenneth R. Feinberg, et al. asserting claims for gross negligence, negligence, negligence per se, fraud, fraudulent inducement, promissory estoppel, and unjust enrichment.

The MDL 2179 court has inexplicably refused to permit formal discovery on Feinberg, et al. The PSC also refuses to conduct formal discovery on Feinberg.

In sum, the more important story is how the collusive nature of MDL 2179 has resulted in America’s loss of faith in the federal judicial system.

The following articles may be of interest.

The BP Oil Spill Settlement and Fund Approach Are Wrong For America!

Plaintiffs File Motion in MDL 2179 to Hold Feinberg, et al. Accountable for Financially Ruining Them.

BP Oil Spill: An Open Letter to the MDL 2179 Plaintiffs’ Steering Committee (“PSC”)

Reply to PSC’s Response to the Open Letter Dated December 21, 2012

Plaintiffs’ Memorandum of Law in Support of Their Motion to Remand or, in the Alternative, Motion to Commence Formal Discovery

GM, Like BP, Will Use Multidistrict Litigation and the Fund Approach to Limit Its Liability

GM, Like BP, Will Use Multidistrict Litigation and the Fund Approach to Limit Its Liability

 

April 3, 2014

The Faulty GM Ignition Switch
Since February, 2014, General Motors (“GM”) has recalled 2.6 million cars – mostly Chevrolet Cobalts and Saturn Ions – over a faulty ignition switch, which can cause the engine to cut off in traffic, disabling the power steering, power brakes and air bags and making it difficult to control the vehicle.

Rep. Henry Waxman, D-Calif., said that House Energy and Commerce Committee staff members found 133 warranty claims filed with GM over 10 years detailing customer complaints of sudden engine stalling when they drove over a bump or brushed keys with their knees.

The claims were filed between June 2003 and June 2012. Waxman said that because GM didn’t undertake a simple fix when it learned of the problem, “at least a dozen people have died in defective GM vehicles.”

GM intends to handle its liability for failing to properly address its faulty ignition switch problem in the same manner that BP addressed its liability for the BP oil spill of 2010 in the Gulf of Mexico. It’s basically a simple two-pronged approach:

(a) The United States Judicial Panel on Multidistrict Litigation (“JPML”) will order that centralization of the GM faulty ignition switch cases will “eliminate duplicative discovery, prevent inconsistent pretrial rulings, and conserve the resources of the parties, their counsel, and the judiciary; and serve the convenience of the parties and witnesses and promote the more just and efficient conduct of the cases.” In sum, all GM cases will be consolidated in one transferee federal court; and (b) GM retains Feinberg Rozen, LLP to manage a fund to allegedly compensate the GM victims for all “legitimate” claims.

GM ignition switch victims may find the following manner in which BP limited its liability for the BP oil spill of 2010 to be instructive.

Multidistrict Litigation (“MDL”) and the Fund Approach
Judicial economy is undoubtedly well-served by MDL consolidation when scores of similar cases are pending in the courts. Regrettably, for victims of the BP oil spill, the BP Oil Spill Multidistrict Litigation (“MDL 2179”) is a “faux” MDL – i.e., an MDL that limits the liability of the defendants, grants excessive compensation to the members of the Plaintiffs’ Steering Committee (“PSC”) and other counsel performing common benefit work, and fails to adequately compensate the plaintiffs.

MDL 2179 is a “faux” MDL primarily because of: (a) the manner in which Kenneth R. Feinberg was permitted by the JPML and the MDL 2179 Court to administer the BP compensation fund; and (b) the terms and conditions of the BP/PSC class settlement agreement.

MDL 2179 officially started on August 10, 2010. The Transfer Order issued on that date by JPML clearly states: “.. Centralization may also facilitate closer coordination with Kenneth Feinberg’s administration of the BP compensation fund.” The JPML made it clear from the very beginning that the purpose of centralization was not merely to eliminate duplicative discovery, prevent inconsistent pretrial rulings, and conserve the resources of the parties, their counsel, and the judiciary; and serve the convenience of the parties and witnesses and promote the more just and efficient conduct of the BP oil spill cases. Here, the purpose of centralization was to maximize judicial economy via the creation of a “faux” class settlement wrapped in a “faux” MDL.

From the very beginning, the purpose of MDL 2179 was to replace democratic adversarial litigation with a fund approach to compensating victims of the BP oil spill. The vast majority of BP oil spill victims will never have their day in court. Judicial economy, rather than justice, is the primary objective.

The fund approach to resolving mass claims, i.e., those claims resulting from the BP oil spill incident, ought to be viewed with a significant degree of concern. The precedent established by the JPML and the MDL 2179 Court is clear: A “Responsible Party” under the Oil Pollution Act of 1990 (“OPA 90”) may now enter into a contract with a politically well-connected third party “Claims Administrator,” i.e., Kenneth R. Feinberg and Feinberg Rozen, LLP, d/b/a Gulf Coast Claims Facility (“GCCF”). This third party “Administrator / Straw Person,” directly and excessively compensated by the party responsible for the oil spill incident, may totally disregard OPA 90, operate the claims process of the responsible party as fraudulently and negligently as it desires for the sole purpose of limiting the liability of, and providing closure to, the responsible party, and the third party “Administrator / Straw Person” shall never be held accountable for its tortious acts.

The operation of the GCCF has allowed BP to control, manage, and settle its liabilities on highly preferential terms; has permitted members of the MDL 2179 PSC, who are directly appointed by Judge Barbier, to be excessively compensated for merely negotiating a collusive settlement agreement; and has enabled judges to clear their dockets of large numbers of cases. In sum, fund approaches to resolving massive liabilities shift power over claims resolution entirely into the hands of self-interested parties and largely evade judicial scrutiny and oversight.

As noted above, judicial economy is undoubtedly well-served by MDL consolidation when scores of similar cases are pending in the courts. Nevertheless, the excessive delay and marginalization of juror fact finding (i.e., dearth of jury trials) associated with traditional MDL practice are developments that cannot be defended. The appropriate focus for fund resolution of mass claims should be justice for the claimants, not merely judicial economy and closure for the corporate misfeasor.

Kenneth Feinberg’s Administration of the BP Compensation Fund
On August 23, 2010, Feinberg Rozen, LLP, doing business as GCCF, replaced the claims process which BP had established to fulfill its obligations as a responsible party pursuant to OPA 90.

Kenneth Feinberg used the fear of costly and protracted litigation to coerce victims of the BP oil spill to accept grossly inadequate settlements from GCCF. During town hall meetings organized to promote GCCF, Feinberg repeatedly told victims of the BP oil spill, “the litigation route in court will mean uncertainty, years of delay and a big cut for the lawyers.” “I am determined to come up with a system that will be more generous, more beneficial, than if you go and file a lawsuit.” “It is not in your interest to tie up you and the courts in years of uncertain protracted litigation when there is an alternative that has been created,” Feinberg said. He added, “I take the position, if I don’t find you eligible, no court will find you eligible.”

GCCF employed two strategies to limit BP’s liability:
(a) an “Expedited Emergency Advance Payment (“EAP”) Denial” strategy. This strategy is as follows: “Fail to verify, investigate, and appraise the amount of loss claimed by the claimant in the EAP claim and deny the EAP claim without ever requesting supporting documentation from the claimant;” and

(b) a “Delay, Deny, Defend” strategy against legitimate oil spill victims. This strategy, commonly used by unscrupulous insurance companies, is as follows: “Delay payment, starve claimant, and then offer the economically and emotionally-stressed claimant a miniscule percent of all damages to which the claimant is entitled. If the financially ruined claimant rejects the settlement offer, he or she may sue.”

The ultimate objective of Feinberg’s “Expedited EAP Denial” strategy and “Delay, Deny, Defend” strategy was to limit BP’s liability by obtaining a signed “Release and Covenant Not to Sue” from as many BP oil spill victims as possible.

The “Release and Covenant Not to Sue” requirement forces economically and emotionally-stressed victims of the BP oil spill to sign a release and covenant not to sue in order to receive a miniscule payment amount for all damages, including future damages, they incur as a result of the BP oil spill. Feinberg’s “Release and Covenant Not to Sue” requirement violates OPA 90, State contract law, and is contrary to public policy.

The “Expedited EAP Denial” strategy and “Delay, Deny, Defend” strategy, although unconscionable, have proven to be very effective for Feinberg and BP:

The GCCF data indicates that a total of 574,379 unique claimants filed claims with the GCCF during the period from approximately August 23, 2010 to March 7, 2012. The GCCF paid only 221,358 of these claimants. In sum, the GCCF denied payment to approximately 61.46% of the claimants who filed claims; the average total amount paid per claimant was $27,466.47.

The status report data further indicates that the GCCF paid a total of 230,370 claimants who filed claims with the GCCF during the “Phase II” period. Of these, 195,109 were either Quick Pay or Full Review Final payments; only 35,261 were Interim payments. In sum, the GCCF forced 84.68% of the claimants to sign a release and covenant not to sue in which the claimant agreed not to sue BP and all other potentially liable parties; only 15.31% of the claimants were not required to sign a release and covenant not to sue in order to be paid. Feinberg’s “Release and Covenant Not to Sue” excluded approximately 200,000 BP oil spill victims from the MDL 2179 Economic and Property Damages Class Settlement Agreement.

The BP/PSC Class Settlement Agreement
BP and the PSC reported settlement negotiations began “in earnest” in February 2011 for two distinct class action settlements: a Medical Benefits Settlement and an Economic and Property Damages Settlement.” In sum, the PSC initiated settlement negotiations “in earnest” merely four (4) months after Judge Barbier appointed members to the PSC. Clearly, the MDL 2179 class settlement was not achieved in the full context of adversarial litigation.

There is little doubt that any class settlement agreement which: (a) excludes approximately 200,000 claimants from the settlement benefits because they had been forced to sign an unconscionable “Release and Covenant Not to Sue;” and
(b) excessively compensates members of the PSC and other counsel performing common benefit work is neither “fair, adequate, and reasonable” nor “free from collusion.”

In sum, a faux class settlement wrapped in a faux MDL is not right for America because it:

(a) allows judicial economy to replace justice; and

(b) denies access to the courts by permitting the desires and influence of corporations with deep pockets, and politically well-connected defendants, to trump the legal rights of the individual.

GM victims and BP victims deserve better!

N.B. – BP paid Feinberg Rozen, LLP a sum of $1.25 million per month to limit its liability (“administer the BP oil spill victims’ compensation fund”).

UPDATE (April 25, 2014): Plaintiffs File Motion to Hold Kenneth R. Feinberg, et al. Accountable for Financially Ruining Them

CLICK HERE TO SIGN THE PETITION FOR GM VICTIMS

CLICK HERE TO SIGN THE PETITION FOR BP VICTIMS

Tagged with: ,

Oil Spill Settlements, Especially the BP Oil Spill Settlement, Are Wrong For America!

The BP Oil Spill Settlement Is Wrong For America!

By

Brian J. Donovan

Tampa, FL (March 31, 2014) – Oil spill settlements, especially the BP oil spill settlement, are wrong for America!

The BP Oil Spill Multidistrict Litigation (“MDL 2179”) officially started on August 10, 2010. The Transfer Order issued on that date by the United States Judicial Panel on Multidistrict Litigation (“JPML”) clearly states: “…. Centralization may also facilitate closer coordination with Kenneth Feinberg’s administration of the BP compensation fund.” From the very beginning, the purpose of MDL 2179 was to replace democratic adversarial litigation with a fund approach to compensating victims of the BP oil spill. The vast majority of BP oil spill victims would never have their day in court. Judicial economy, rather than justice, was the primary objective.

The fund approach to resolving mass claims, i.e., those claims resulting from the BP oil spill incident, ought to be viewed with a significant degree of concern. The precedent established by the JPML and the MDL 2179 Court is clear: A “Responsible Party” under the Oil Pollution Act of 1990 (“OPA 90”) may now enter into a contract with a politically well-connected third party “Claims Administrator,” i.e., Kenneth R. Feinberg and Feinberg Rozen, LLP, d/b/a Gulf Coast Claims Facility (“GCCF”). This third party “Administrator / Straw Person,” directly and excessively compensated by the party responsible for the oil spill incident, may totally disregard OPA 90, operate the claims process of the responsible party as fraudulently and negligently as it desires for the sole purpose of limiting the liability of, and providing closure to, the responsible party, and the third party “Administrator / Straw Person” shall never be held accountable for its tortious acts.

The operation of the GCCF has allowed BP to control, manage, and settle its liabilities on highly preferential terms; has permitted members of the MDL 2179 Plaintiffs’ Steering Committee, who are directly appointed by Judge Barbier, to be excessively compensated for merely negotiating a collusive settlement agreement; and has enabled judges to clear their dockets of large numbers of cases. In sum, fund approaches to resolving massive liabilities shift power over claims resolution entirely into the hands of self-interested parties and largely evade judicial scrutiny and oversight.

Judicial economy is undoubtedly well-served by MDL consolidation when scores of similar cases are pending in the courts. Nevertheless, the excessive delay and marginalization of juror fact finding (i.e., dearth of jury trials) associated with traditional MDL practice are developments that cannot be defended. The appropriate focus for fund resolution of mass claims should be justice for the claimants, not merely judicial economy and closure for the corporate misfeasor.

In sum, the major oil companies own Congress and the federal judicial system.

However, we can change that in regard to catastrophic oil spills by demanding that Congress holds responsible parties accountable. Proper enforcement of the Oil Pollution Act of 1990 and the Oil Spill Liability Trust Fund (“OSLTF”) will eliminate the need for costly and protracted litigation.

Demand that Congress requires responsible parties to pay the full costs and damages resulting from an oil spill incident by defining the term “expenditure,” under the OSLTF, as “an expenditure that is not reimbursed by the responsible party.”

N.B. – BP paid Feinberg Rozen, LLP a sum of $1.25 million per month to limit its liability (“administer the BP oil spill victims’ compensation fund”).

Spread the word and sign the petition: The Intended Purpose of the OSLTF Is to Fully Compensate Oil Spill Victims via Subrogation

Tagged with:

BP Oil Spill: Plaintiffs Oppose Class Action Lawsuits in MDL 2179

Posted in BP, class action, Feinberg, Feinberg Rozen, GCCF, Gulf Coast Claims Facility, Mass Tort by renergie on December 5, 2011

BP Oil Spill: Plaintiffs Oppose Class Action Lawsuits in MDL 2179

________________________________

Plaintiffs Are Entitled to Receive the True Value of Their Claims

Tampa, FL (December 5, 2011) – Plaintiffs in Pinellas Marine Salvage, Inc., et al. v. Kenneth R. Feinberg, et al. and Salvesen v. Kenneth R. Feinberg, et al. have each filed a motion in opposition to class certification of any action in MDL 2179. The motions were filed in the United States District Court for the Eastern District of Louisiana for the following three reasons:

I. Defendants Feinberg, et al. Have No Incentive to Settle Claims  

Defendants Feinberg, et al. have established a claims process with the primary function of convincing claimants that the only compensation available is a minimal set amount that comes with a full release attached. The MDL 2179 Plaintiffs’ Steering Committee states, “The delay in responding to interim claims, the near-complete failure to pay interim claims, and the skewed final payment calculation delivers the message to over 112,000 putative class members: the only way to ever get any more compensation is to take the quick payment amount and sign a release.”

On August 26, 2011, in the Court’s Order and Reasons [As to Motions to Dismiss the B1 Master Complaint], Judge Barbier found,

“…. that nothing prohibits Defendants from settling claims for economic loss. While OPA does not specifically address the use of waivers and releases by Responsible Parties, the statute also does not clearly prohibit it. In fact, as the Court has recognized in this Order, one of the goals of OPA was to allow for speedy and efficient recovery by victims of an oil spill.”

In the same Order, the MDL 2179 Court also found,

“State law, both statutory and common, is preempted by maritime law, notwithstanding OPA’s savings provisions. All claims brought under state law are dismissed.”

II. Plaintiffs Are Entitled to Receive the True Value of Their Claims

The true value of a claim submitted to the Gulf Coast Claims Facility (“GCCF”) for lost earnings or profits is approximately the amount equal to the average monthly loss in earnings or profits for the period from May 1, 2010 through April 30, 2011 multiplied by fifty (50) months. In other words, if the average monthly loss in earnings or profits for the period from May 1, 2010 through April 30, 2011 is $5,000.00, the true value of the claim submitted to GCCF is calculated as follows:

True Value of Claim = ($5,000/month)(50 months) = $250,000.00

The Fifth Circuit has noted, “In addition to skewing trial outcomes, class certification creates insurmountable pressure on defendants to settle, whereas individual trials would not. The risk of facing an all-or-nothing verdict presents too high a risk, even when the probability of an adverse judgment is low. These settlements have been referred to as judicial blackmail.” Castano v. Am. Tobacco Co., 84 F.3d 734, 746 (5th Cir. 1996) (citations and footnote omitted). This generalization is not applicable to class certification in MDL 2179. Here, the class certification would be in a mass tort context within the context of a multidistrict litigation. Given that “all individual petitions or complaints that fall within Pleading Bundles B1, B3, D1, or D2, whether pre-existing or filed hereafter, are stayed until further order of the Court” (Pretrial Order No. 25, Para. 8), certification of pending class actions would most probably not be decided until the conclusion of the limitation and liability trial which does not commence until February, 2012. “It was reported that one attorney has approximately 23,000 claimants and inquiry was made as to whether the attorney may produce the information in the form in which it is maintained rather than complete individual PPFs.” (Rec. Doc. 642 at Page 2). As of November 16, 2011, there are 523 actions, which encompass approximately 130,000 total individual claims, pending in MDL 2179. In other words, tens of thousands of potential class members are in legal limbo. This hardly “creates insurmountable pressure on defendants to settle.”

In the context of one of the largest mass tort cases in United States history, the damages suffered by the vast majority of individual potential plaintiffs as a result of the BP oil spill of April, 2010, and the subsequent “Delay, Deny, Defend” strategy of Feinberg, et al., are potentially so great that class treatment would not be necessary to permit effective litigation of the claims. Here, when the amount of damages suffered by the individual is so great, the filing of an individual lawsuit should be economically feasible and would be in the best interests of the plaintiffs.

The associated cost, consumption of time, and ongoing negative publicity of numerous trials, rather than a few class action lawsuits, are required in order exert the proper amount of pressure on Feinberg, et al. to negotiate a settlement which reflects the true value of the claim and not one which focuses on minimizing the liability of Feinberg Rozen, LLP, Feinberg/GCCF, and the responsible parties.

III. MDL 2179 Plaintiffs Are Not Able to Prove That Class Certification is Appropriate Under Federal Rule of Civil Procedure 23

MDL 2179 Plaintiffs in proposed class actions are not able to meet their heavy burden of proving that class certification is appropriate under Federal Rule of Civil Procedure 23 for the reasons which are thoroughly discussed in the memorandum of law which is filed with the motion.

BACKGROUND

Pinellas Marine Salvage, Inc., et al. v. Kenneth R. Feinberg, et al. and Salvesen v. Feinberg, et al. are the only two cases of their kind filed in any court in the country. Each complaint alleges, in part, that Defendants Kenneth R. Feinberg, Feinberg Rozen, LLP, GCCF, and (in Salvesen) William G. Green, Jr. misled Plaintiffs by employing a “Delay, Deny, Defend” strategy against them. This strategy, commonly used by unscrupulous insurance companies, is as follows: “Delay payment, starve claimant, and then offer the economically and emotionally-stressed claimant a miniscule percent of all damages to which the claimant is entitled. If the financially ruined claimant rejects the settlement offer, he or she may sue.” Each action, originally filed in Florida state court, is brought by Plaintiff under the following seven causes of action: (a) Gross Negligence; (b) Negligence; (c) Negligence Per Se; (d) Fraud; (e) Fraudulent Inducement; (f) Promissory Estoppel; and (g) Unjust Enrichment.

The MDL Panel ordered each action transferred to MDL No. 2179 on the erroneous grounds that “[These] action[s], similar to other actions already in the MDL, arise from alleged injury to plaintiffs’ business resulting from the oil spill.”

The clarity of the analysis of the scope of OCSLA by Judge Carlton W. Reeves in State of Mississippi v. Gulf Coast Claims Facility, et al., C.A. No. 3:11-00509 (S.D. Miss. 2011) is both refreshing and instructive. On July 12, 2011, Attorney General Jim Hood (“Hood”) filed suit on behalf of the State of Mississippi against the GCCF and Kenneth Feinberg in Hinds County Chancery Court. On August 11, 2011, the GCCF removed the case to the United States District Court for the Southern District of Mississippi (“MSSD”) claiming that original jurisdiction lies with the MSSD by virtue of the OCSLA. Hood moved to remand the case to state court on September 12, 2011. On November 15, 2011, Judge Reeves granted Hood’s motion to remand.

Judge Reeves found, “GCCF’s argument that Hood has unwittingly stated a claim under OCSLA is likewise not compelling. According to OCSLA, federal courts enjoy subject-matter jurisdiction ‘of cases and controversies arising out of, or in connection with (A) any operation conducted on the outer Continental Shelf which involves exploration, development, or production of the minerals, of the subsoil and seabed of the outer Continental Shelf . . . .’ The Fifth Circuit has written that it “applies a broad ‘but-for’ test to determine whether a cause of action arises under OCSLA.” Hufnagel v. Omega Serv. Indust., Inc., 182 F.3d 340, 350 (5th Cir. 1999). “And in GCCF’s view, because it would not exist but for the Deepwater Horizon’s explosion, this case (and, presumably, any other case to which it could ever be a party) necessarily implicates OCSLA.” State of Mississippi v. Gulf Coast Claims Facility, et al., C.A. No. 3:11-00509 (S.D. Miss. 2011), Order of Remand at Page 10.

“GCCF is correct that the Fifth Circuit views ‘the jurisdictional grant contained in U.S.C. § 1349(b)(1) as very broad.’ But to view OCSLA’s scope so far-reaching as does GCCF would render GCCF’s every potentially actionable decision a federal case, be it related to the claims process at hand or a GCCF employee’s car wreck en route to the office.” (Emphasis added)

Neither OCSLA’s plain language nor the Fifth Circuit’s decisions interpreting it contain any indication that matters so far removed as these – occurring not on the outer Continental Shelf but doing business in Dublin, Ohio, and aimed not at the “exploration, development, or product of . . . minerals” but rather at “developing and publishing standards for recoverable claims” related to the Deepwater Horizon spill – fall within the purview of Section 1349(b)(1), which addresses “any operation conducted on the outer Continental Shelf . . . .” Plainly, although GCCF’s activities amount [to] an operation, that operation is not conducted “on the outer Continental Shelf.” Therefore, OCSLA does not apply and is not a proper basis for federal jurisdiction. (Emphasis added)

CONCLUSION

Plaintiffs continue to suffer damages from three separate sources:

(a) once from the oil spill, the environmental and economic damages of which have devastated their way of life;

(b) again by being left in financial ruin as a direct result of Feinberg’s “Delay, Deny, Defend” strategy; and

(c) a third time for daring to demand justice, which will consume their time, energy and hopes for years to come if they are held hostage by protracted litigation.

If motions for class certification pursuant to Federal Rule of Civil Procedure 23 are granted in MDL 2179, Defendants Feinberg, et al. will continue to have no incentive to settle claims and Plaintiffs will never receive the true value of their claims.